IOCL Case Study

INDIAN OIL CORPORATION LTD,PARADIP-HALDIA CRUDE OIL PIPELINE ,PARADIP,ORISSA

WHERE

INDIAN OIL CORPORATION LTD,PARADIP-HALDIA CRUDE OIL PIPELINE DIVISION,PARADIP,ORISSA

what

4X1000KVA DG set with syncronizing panel & step up transformer (415V TO 6.6KV) catering the essential loads of the Paradip-Haldia crude pipeline during the period of non-availability of grid power supply from CESCO

PURPOSE

To cater essential loads of the Paradip-Haldia crude pipeline during the period of non-availability of grid power supply from CESCO

PRIMARY CHOICE FACTORS

  • Experience & technical competence.
  • Financial soundness the vendor.

4MVA POWER SUPPLY TO INDIAN OIL CORPORATION LTD,PARADIP-HALDIA PIPELINE DIVISION

THE COMPANY

  • IOCL is India's largest company by sales with a turnover of Rs. 3,28,744 crore ($ 72,125 million) and profit of Rs. 7445 crore ($ 1,633 million) for the year 2010-11
  • Indian Oil is the highest ranked Indian company in the latest Fortune ‘Global 500’ listings, ranked at the 98th position .

BACKGROUND

  • Paradip Haldia Barauni pipeline (phbpl) a unit of iocl ltd fortune global 500 company.
  • Ensures the availability of crude oil to three iocl refineries haldia ,barauni,bongaigaon & petrochemicals

THE CHELLANGE

  • IOCL desired 4mva,6.6kv reliable power without even an interuption for regular maintenance or breakdown during cesco failure.
  • The project required to be completed within a 55 days from the date of order.
  • Transportation was chellange as paradip is remote & distant corner of india & not easy excess to major cities.
  • Syncronizing panel to be provided to syncronize 4 no.s dg sets.
  • Statutory approval also required to be taken in the respective authorities like central electrical authority & central explosive department etc. in the 55 days period

THE REQUIREMENT

  • To cater the essential loads of the paradip station of paradip-haldia crude pipeline during the period of non-availability of grid power supply from cesco/dusring switchyard maintenance
  • 4mw ,6.6kv,3phase ,50hz reliable power requirement during the above mentioned work..

THE SOLUTIONS

4MVA ,(1000KVA x 4) 3phase temporary power plant including erection ,testing,commissioning,operation & maintenance on round the clock basis for supplying power at 6.6KVA output through 415/433V DG sets in acoustic enclosure with step-up transformer ,syncronized with associate AMF panel with NGR/NIS requisite protections & ,metering with trained manpower to operate 24/7hrs.

THE ACHIEVEMENT

  • The project was completed within a 55 days deadline including the mobilization of whole system from pune.
  • The system has been tested successfully to run continousaly for 24/7 hrs.basis