Indian Oil Corporation Ltd, Paradip-Haldia Crude Oil Pipeline, Paradip, Orissa

WHERE
Indian Oil Corporation Ltd, Paradip-Haldia Crude Oil Pipeline, Paradip, Orissa
WHAT
4X1000KVA DG SET WITH SYNCRONIZING PANEL & STEP UP TRANSFORMER (415V TO 6.6KV) CATERING THE ESSENTIAL LOADS OF THE PARADIP-HALDIA CRUDE PIPELINE DURING THE PERIOD OF NON AVAILABILITY OF GRID POWER SUPPLY FROM CESCO
PURPOSE
TO CATER ESSENTIAL LOADS OF THE PARADIP-HALDIA CRUDE PIPELINE DURING THE PERIOD OF NON-AVAILABILITY OF GRID POWER SUPPLY FROM CESCO
PRIMARY CHOICE FACTORS
  • Experienced & Technically competent.
  • Financially soundness the vendor.

4 MVA POWER SUPPLY TO INDIAN Building Confidence OIL CORPORATION LTD,PARADIP-HALDIA PIPELINE DIVISION

THE COMPANY
  • IOCL is India’s largest company by sales with a turnover of Rs. 3,28,744 croro ($ 72,125 million) and profit of Rs. 7445 crore ($ 1,633 million) for the year 2010-11
  • Indian Oil is the highest ranked Indian company in the latest Fortune ‘Global 500 listings, rankod at the 98th position
THE REQUIREMENT
  • TO CATER THE ESSENTIAL LOADS OF THE PARADIP STATION OF PARADIP-HALDIA CRUDE PIPELINE DURING THE PERIOD OF NON AVAILABILITY OF GRID POWER SUPPLY FROM CESCO/DUSRING SWITCHYARD MAINTENANCE
  • 4MW ,6.6KV.3PHASE,50HZ RELIABLE POWER RE QUIREMENT DURING THE ABOVE MENTIONED WORK
BACKGROUND
  • PARADIP HALDIA BARAUNI PIPELINE (PHBPL) A UNIT OF IOCL LTD FORTUNE GLOBAL 500 COMPANY.
  • ENSURES THE AVAILABILITY OF CRUDE OIL TO THREE IOCL REFINERIES HALDIA ,BARAUNI, BON GAIGAON & PETROCHEMICALS
THE CHALLENGE

IOCL DESIRED 4MVA,6.6KV RELIABLE POWER WITHOUT EVEN AN INTERUPTION FOR REGULAR MAINTENANCE OR BREAKDOWN DURING CESCO FAILURE.

  • THE PROJECT REQUIRED TO BE COMPLETED WITHIN A 55 DAYS FROM THE DATE OF ORDER.
  • TRANSPORTATION WAS CHELLANGE AS PARADIP IS REMOTE & DISTANT CORNER OF INDIA & NOT EASY EXCESS TO MAJOR CITIES.
  • SYNCRONIZING PANEL TO BE PROVIDED TO SYN CRONIZE 4 NO.S DG SETS
  • STATUTORY APPROVAL ALSO REQUIRED TO BE TAKEN IN THE RESPECTIVE AUTHORITIES LIKE CENTRAL ELECTRICAL AUTHORITY & CENTRAL EXPLOSIVE DEPARTMENT ETC. IN THE 35 DAYS PERIOD
THE SOLUTION

4MVA, (1000KVA X 4) 3PHASE TEMPORARY POWER PLANT INCLUDING ERECTION, TESTING,COMMISSIONING, OPERATION & MAINTENANCE ON ROUND THE CLOCK BASIS FOR SUPPLYING POWER AT 6.6K VA OUTPUT THROUGH 415/433V DG SETS IN ACOUSTIC ENCLOSURE WITH STEP-UP TRANS FORMER SYNCRONIZED WITH ASSOCIA AMF PANEL WITH NGR/NIS REQUISITE PROTECTIONS & METERING WITH TRAINED MANPOWER TO OPERATE 24/7 HRS

THE ACHIEVEMENT
  • THE PROJECT WAS COMPLETED WITHIN A 55 DAYS DEADLINE INCLUDING THE MOBILIZATION OF WHOLE SYSTEM FROM PUNE.
  • THE SYSTEM HAS BEEN TESTED SUCCESS FULLY TO RUN CONTINOUSALY FOR 24/7HRS BASIS